9.8 Km tunnel built in J&K, Railway completed the construction
9.8 km tunnel connecting two stations on the 111 km under construction Banihal-Katra railway link in Jammu and Kashmir was completed.
9.8 km tunnel connecting two stations on the 111 km under construction Banihal-Katra railway link in Jammu and Kashmir was completed.